A selection of completed and ongoing projects by Ayon Babil Company in the fields of oil, industry, chemical materials, and contracting.
| No. | Project Name / Work Description | Beneficiary | Amount | Contract Status |
|---|---|---|---|---|
| 1 | Operation of melting foundry furnaces by installing and operating electronic control systems and rehabilitating mechanical works in 2025 | Ministry of Industry / State Company for Steel Industries | 150,000 USD | Completed |
| 2 | Supply, installation, and operation of central air-conditioning units for the ground equipment and machinery factory in 2022 | Iraqi Airways Company / Baghdad International Airport | 480,000 USD | Completed |
| 3 | Supply and installation of fire dampers in the maintenance building halls in 2022 | Iraqi Airways Company / Baghdad International Airport | 70,000 USD | Completed |
| 4 | Supply and installation of cooling units in the rooms and halls of the central administration for the ground equipment and machinery factory in 2022 | Iraqi Airways Company / Baghdad International Airport | 80,000 USD | Completed |
| 5 | Rehabilitation of the large annealing furnace by supplying, installing, and operating the PLC industrial automation system, rehabilitating all 37 burners, and rehabilitating the trolley in 2023 | Ministry of Oil / State Company for Heavy Engineering Equipment | 200,000 USD | Completed |
| 6 | Operation and development of the electronic control system for induction furnaces in 2018 | Ministry of Industry / State Company for Steel Industries | 100,000 USD | Completed |
| 7 | Maintenance and operation of the furnaces of Al-Shawahig Iron and Steel Factory | Al-Nizal Company for Trading and General Contracting | 120,000 USD | Completed |
| 8 | Design, supply, and installation of the emergency shutdown system and fire alarm system for LPG gas tanks in 2024 | Ministry of Oil / State Company for Heavy Engineering Equipment | 40,000 USD | Completed |
| 9 | Rehabilitation of cathode and anode electrodes with the supply of necessary accessories for the cells as part of the rehabilitation works of the electrolysis cells for the soda and chlorine factory | Ministry of Industry / Al-Furat State Company for Chemical Industries | 250,000 USD | Completed |
| 10 | Exclusive contract for transporting all chemical materials with Al-Furat State Company for Chemical Industries for one year from 18/8/2025 | Ministry of Industry / Al-Furat State Company for Chemical Industries | - | In Progress |
| 11 | Rehabilitation of the programmed flame and plasma cutting machine MSEER in 2025 | Ministry of Oil / State Company for Heavy Engineering Equipment | 120,000 USD | Completed |
| 12 | Rehabilitation of the 100 mm plate rolling machine at the equipment factory in 2025 | Ministry of Oil / State Company for Heavy Engineering Equipment | 20,000 USD | Completed |
| 13 | Rehabilitation and operation of the small annealing furnace at the boiler factory and development of the electronic control system in 2021 | Ministry of Oil / State Company for Heavy Engineering Equipment | 70,000 USD | Completed |
| 14 | Thermal lining works for oil refining furnaces at Baiji Refinery in 2023 for units A0, A1, and A2 | Ministry of Oil / North Refineries Company / Al-Sumood Refinery | 300,000 USD | Completed |
| 15 | Design, installation, and operation of a firefighting network for the refining units of Haditha Refinery | Kobani Company for General Contracting | 50,000 USD | Completed |
| 16 | Supply and installation works for a liquid oxygen network | Ministry of Oil / State Company for Heavy Engineering Equipment | 7,000 USD | Completed |
| 17 | Thermal lining works for two refining units at Haditha Refinery | Kobani Company for General Contracting | 270,000 USD | Completed |
| 18 | Rehabilitation works for two tank rolling machines | Ministry of Oil / State Company for Heavy Engineering Equipment | 25,000 USD | Completed |
| 19 | Supply works for a valve repair machine | Ministry of Oil / North Gas Company | 300,000 USD | In Progress |
| 20 | Supply works for a valve lapping machine | Ministry of Oil / Basra Oil Company | 150,000 USD | In Progress |
| 21 | Supply works for tube fin pipes for heat exchangers | Ministry of Oil / State Company for Engineering Equipment / Kobani Company for Trading and General Contracting | 300,000 USD | In Progress |
| 22 | Supply works for gaskets for cathode and anode electrodes | Ministry of Industry and Minerals / Al-Furat State Company for Chemical Industries | 130,000 USD | In Progress |
| 23 | Rehabilitation works for the programmed cutting machine Vyska / Equipment Factory | Iraqi Ministry of Oil / State Company for Heavy Engineering Equipment | 150,000 USD | In Progress |
| 24 | Rehabilitation works for the programmed cutting machine Vyska / Boiler Factory | Iraqi Ministry of Oil / State Company for Heavy Engineering Equipment | 150,000 USD | In Progress |
| 25 | Manufacturing works for a chlorine removal tank | Ministry of Industry and Minerals / Al-Furat State Company for Chemical Industries | 75,000 USD | In Progress |
| 26 | Chiller repair works for the acid factory | Ministry of Industry and Minerals / Al-Furat State Company for Chemical Industries | 78,000 USD | Completed |
| 27 | Supply works for control cards for the rectifier system | Ministry of Industry and Minerals / Al-Furat State Company for Chemical Industries | 68,000 USD | Completed |
| 28 | Rehabilitation works for the remaining electrodes of the electrolysis cells for the soda and chlorine factory | Ministry of Industry and Minerals / Al-Furat State Company for Chemical Industries | 65,000 USD | Completed |
We are Ayon Babil Company for General Trading, General Contracting, Trading and Transportation of Chemical Materials Ltd.